Project implementation

CMI’s added value is definitely in the implementation of your energy efficiency improvement project from A to Z.

Our turnkey offer includes:

  • Basic and detailed engineering studies (thermal, mechanical and electrical aspects)
  • Project management
  • Assembly
  • Commissioning
  • Reception
  • Performance testing.

And do not forget the most important aspect:
CMI guarantees the energy performance of their solutions.

Example: energy efficiency improvement of a steel billets reheat furnace

-
The preliminary audit of the furnace highlights a key action: increasing the preheat temperature of the combustion air.
- The production data of a whole month are gathered and analyzed, and the relevant sizing points are selected. The objective is to define the size of the new collector
- The new collector and ducts are designed to limit pressure drops in the circuit and keep the exhauster in place.

Steel billets reheat furnace.pngnew recovery unit.pngPerformance check.png

Benefit: energy savings 8,4 %, i.e. 11 GWh/year.
A follow-up indicator was also put in place to check on the performance of the recovery unit over time.


Should your company have a major project but not the resources nor time to fully go with it, please do not hesitate to contact our project team at  CMI Energy Efficiency by phone at +33 (0)1 30 45 90 59 or by email at energy.efficiency@cmigroupe.com