CMI Thermline has developed a concept of Thermal sections for CCL which gives answers to all the today concerns of Coated Coils Producers, from Production Costs to Productivity
CMI Thermline offers the exclusive combination of:
- LECO™ : Progressive Convective Drying, in order to success any kind of Coating type, at any possible CCL output
- LECO™ : High performances Thermal Oxidizer, allowing to continuously match with European Norms of Emission at Stack
- LECO™ : Combination of Regenerative and Convective batteries, in order to moderate as much as possible the energy consumption
- LECO™ : Optimized Insulation and Thermal Inertia, in order to reach the best flexibility of operation (transient phases, restart phases)
- LECO™ : Possible final Heat Recovery before stack, through Hot Water or Steam Production
- LECO™ : Reliable technical measure for any risk for operators and equipments
- High performing Cooling sections: anti-scratches devices, low Demi Water consumption, easy maintenance solutions, 100% drying Squeegee systems, …
- Clever furnace control thanks to level 1, tele-maintenance, remote control and assistance on process
- Customized furnace layout : 1 or 2 passes, passes by-passable, optional pretreatment coating
- Combination of CGL with CCL
- Multi-purpose Oven : wide range of possible widths, thicknesses, Coatings, Solvents, …
- Energy reduction : the recovered power is 2 X the possible kW of conventional Convective Technology
- LECO™ Cost per ton : the energy input is reduced strictly to the process need, i.e. steel heating. So, can be 100% electricity if needed.
- LECO™ Flexibility : less than half an hour is need to be ready for restart after 8 hours of shut down
- LECO™ convective Ovens provide continuously homogeneity and strip stability
- No quality reduced when entering the cooling section after Curing
- Continuous match with European Standard for Stack Emissions (CO, NOx, CO2, BTX, …), without any peak due to Incineration Cyclic Process
- Cost per tons : the energy input saving is between 20% and 60% with LECO™, depending on alternative technology considered
- Lost power (stack, cooling water, heat losses) : between 10 and 50% of reduction with LECO™, depending on alternative technology considered
- Up to 2MW of power recoverable before the stack for Hot Water or Steam production